Design and assessment

A working prototype is the start of the story, not the end. Before anyone builds a farm of wave or tidal machines, someone has to answer a long list of questions: where exactly, how many, how far apart, how they are held down and wired up, how they will be installed and repaired, what each megawatt-hour will cost and what the project will do to the surrounding sea.

These questions interact. A cheaper mooring might mean more frequent repairs; tighter spacing saves cable but costs energy; a site with a stronger resource may be harder to reach. That is why the sector has invested heavily in design tools that look at a whole project at once instead of one component at a time; our archive article on the DTOceanPlus tools describes one such suite.

The articles below take the questions one at a time, in roughly the order a design team meets them.